Like us on Facebook info @ wardgroup.co.nz

Ward Demolition has a proud history working closely with many industry players across all aspects of the industry including multiple emergency works. With over 25+ years’ experience, there is little that our professional team have not seen or done.  Ward applies this industry insight to the most challenging of demolition projects, finding intelligent and practical solutions, and optimum results. Our project history includes:

  • Watercare/GA-JV Central Interceptor Project

  • City Rail link/Link Alliance throughout the Auckland CBD

  • Marsden Power Station for Mighty River Power

  • Mangere BNR Project for Watercare

  • Wellington Hospital for New Children’s hospital

  • Downer Puhinui new Railway Station – Removal of old station and over rail bridge

  • POAL Wiri inland port emergency works after the 2021 Tornado

  • Mercury Southdown Power Station

EFFECTIVE SITE MANAGEMENT

Experience has shown us that safety, speed and public interface are key site management issues for our clients.  Our integrated services ensure that these issues are effectively managed by giving our project teams more control over jobs, resulting in economical use of resources and seamless, on time delivery.

INNOVATIVE EQUIPMENT

Ward Demolition are at the forefront of the industry for pioneering demolition techniques, Health and Safety and innovative equipment design.  We offer our clients equipment with custom-designed attachments that have set new industry benchmarks for waste material recovery and processing on-site.

RESOURCE RECOVERY

Resource Recovery is the first step in our comprehensive recycling process.  Ward has the capacity to manage large volumes of waste concrete and can service many construction sites across Auckland at any one time. On-site processing of concrete is made possible using our mobile units. Concrete not crushed on-site can be transferred to our yard for processing, where we break down large slabs and foundation concrete to pieces small enough to be fed through our crushers, extracting steel and rebar. This metal product is then cut to manageable sizes with a rebar shear for on-sale, along with other recycled products.


“The professionalism and the high level of work ethic from all of the operators that recovered our Wiri Inland Port is the best that I have seen in my executive career in logistics and leading people. The tornado become the largest inland port disaster in NZ Maritime history, with hundreds of full and empty containers been tumbled like Lego blocks across the 1.1km inland port. The estimated recovery time when we assessed the size of the disaster was 7 to 10 days. The site was recovered by everyone involved within 3 days which today, still is seems unbelievable. This speed of recovery was purely down to the people from each of our teams and the professionalism of each company involved. To everyone involved, thank you so much for recovering our site” - Darcy Hart - Nexus Logistics